Vaalwater 10080 Layer Project:

Wamba Farming Equipment launched the Vaalwater project in 2018 with the design and planning phase to ensure that the structural metrics will be conducive for the environmental changes in the area in order to create optimal ventilation, to manage and secure the sustainability of the Layers.

After the conclusion of the structure the measurements were done to the last millimetre to ensure the optimization of the equipment layout. Installation was initiated with the Manure System as starting point followed by the Cage System and ended with the Egg Collection System.

The Hopper Feeding System was installed and calibrated to secure feed delivery that will be efficient to the birds. The Nipple Drinking System were installed and flushed to get rid of all partials to eliminate any leaks. The water pressure was set via the regulators for each tier and tested to have 100% water availability that is clean and constant.

Our Engineer ensured that all sensors are placed and installed to deliver the correct message to the controller to automize the system in delivering feed and optimization in ventilation control.

A Happy Customer

100080 Layer House construction – 90 x 4 x 4

Layer House construction
Layer House construction

Insulation

Insulation

Lights

Lights

Arrival of Layer Equiptment

Layer Equiptment
Directors and Client

Ventilation

Ventilation System

Manure System Installation

Manure System

Cage Assembly

Cage Asm
Cage Asm
Cage Asm
Cage Asm

Manure Belt

Manure Belt

Layer Cage Fitment

Layer Cage Fitment

Egg Collection System

Egg Collection System

Arrival of the hens

Arrival of the Hens

Placing of the hens

Placement of the hens

Project Complete | One Happy Client

A Happy Customer

Contact Details

Telephone: (+27)79 505 0381
Email: govert@wambagroup.com
Website: www.wambagroup.com

202 Graham Road,
Tiegerpoort,
Pretoria,
South Africa
0043